The use case
One piece of real work, live with real users. The unit of delivery, evidence and learning.
An operating model for enterprise AI adoption
Build AI capability that stays.
From one working AI use case to an organization that transforms itself.
Figure in the film: McKinsey, The state of AI in 2026: On the road to ROI (25 Aug 2026). A self-reported survey of business respondents, not a count of all organizations; the 89% is regular AI use in at least one business function.
One working AI use case is not the goal. The ability to repeat it is. The Adoption Tree® Model takes an organization from its first use case to many, and turns that into a transformed way of working.
AI adoption is the ability to turn AI into trusted, governed, used and measurable ways of working. The Adoption Tree® Model connects a successful use case to the capability needed to sustain and repeat it.
One piece of real work, live with real users. The unit of delivery, evidence and learning.
One end-to-end workflow with an accountable owner. The unit of transformation and scale.
The data, controls, patterns, skills and ownership that every next wave inherits.
Based on the whitepaper · Premise and executive summary, pp. 2–3
The model in one picture: above ground the use cases people see, below ground the capability the organization keeps. Every use case that goes live feeds the roots, so the next one is designed to start further ahead.
Read it as a tree. The branches are the use cases people see and use. The trunk is the temporary Adoption Office that runs them. The roots are the foundation: six blocks of capability the organization keeps. Every use case that goes live feeds the roots, and the next one grows from them.
Hover or tap a use case to see what it feeds back into the roots.
The foundation enables the use case.
The use case makes the foundation stronger.
Sponsor, domain owner and decision rights: who may release, scale, stop and accept risk.
Approved sources, access, quality and provenance the next wave reuses.
An owned foundation with connected systems and replaceable models.
Intended purpose, oversight, evaluation and release evidence, designed in from the start.
Tasks redesigned with the people who do them; competent use built through coaching.
Outcomes against a baseline; the value decision, assets reused and ownership transferred.
The six foundation blocks · Whitepaper, pp. 11–12
Six gates are six steps from use case to adoption: a fixed route so nothing is skipped, a team so everything is recorded, and a named role for everyone. Each wave leaves the organization with learnings it keeps.
Each gate is a decision with a named owner and minimum evidence. A wave that cannot show the evidence waits, changes or stops. Select a block to see what happens in it, who decides and what it gives you.
The reference wave · 24 weeks of working time
Select a block
The 24 weeks are a planning assumption, not an observed duration. The blocks overlap within three rules: nothing is built before Gate 1, nothing goes live before Gate 3, and no realization decision comes before Gate 4.
Gate 0 · Mandate · before the clock starts
In this blockContract the mandate: sponsor, domain owner, internal successor, decision rights, budget, capacity, procurement and access.
What the gate decidesName the sponsor, domain owner and internal successor. Agree the outcome, budget, boundaries, foundation limit and mandate end date.
Ownership, budget and the exit date are settled before anyone picks a use case.
Running alongside
Gate 1 · Select · weeks 1 to 4
In this blockMap the domain, its current workflow, users and AI activity. Establish the baseline, run the applicability screen and select the first use case.
What the gate decidesSelect a bounded piece of work within the domain, with real users and a measurable outcome. Establish its intended purpose and complete the applicability screen.
You commit to one use case with a measured starting point, and you know which rules apply before anything is built.
Running alongside
Gate 2 · Design · weeks 5 to 8
In this blockCo-design the target workflow, human oversight, architecture, data, evaluations, responsible-AI controls, support and learning.
What the gate decidesDefine the target workflow, human oversight, architecture, evaluation thresholds, coaching and support. Each control has an accountable owner. Where it applies, works-council consent is an exit condition.
Controls are designed into the work from the start, and each one has a named owner.
Running alongside
Gate 3 · Release · weeks 9 to 12
In this blockBuild or configure, integrate, test and document. Train coaches, and prepare support and fallback.
What the gate decidesThe use case works as built and runs under its required controls, so it is released to a defined workflow and user group. Monitoring, support, human oversight and rollback are ready.
Nothing reaches real users until it works under its controls. The release and the residual risk are signed separately.
Running alongside
No gate · bounded production · weeks 13 to 16
In this blockRelease to a defined group and workflow. Coach users. Monitor quality, trust, overrides, incidents, cost and outcomes.
No gate hereThis block builds the evidence that Gate 4 will judge: what production produced.
The value decision will rest on what happened in real use.
Running alongside
Gate 4 · Prove · weeks 17 to 20
In this blockCorrect failure modes and compare with the baseline. Update assessments, standardize reusable assets and select the next use case.
What the gate decidesCompare outcomes with the baseline and check the business case against what production produced. Decide whether to scale, change or stop, and which reusable assets become maintained defaults.
Time saved counts only when the owners decide what it becomes. Reusable assets get an owner, so the next wave can build on them.
Running alongside
Gate 5 · Transfer · weeks 21 to 24
In this blockInternal owners chair the rhythm, rehearse incidents and changes, and approve the roadmap and the external exit.
What the gate decidesA named internal owner, not the Adoption Coach, produces and signs a real release pack without external drafting, and a control owner accepts it. The same owners chair the next wave’s mandate and selection decisions while the external team observes in silence.
You end the wave owning the work, and the next wave is designed to start further ahead.
Running alongside
Working time and elapsed time
Gate logic, parallel tracks and reference calendar · Whitepaper, pp. 13–14, 22–23, 28–29
AI keeps moving faster. The capability built here moves with it, because it is owned inside the organization and stays after the Adoption Office has handed over.
A jointly staffed office runs one domain wave. Internal successors are named on day one and take over the rhythm as the wave goes on; an internal Adoption Capability of trained coaches stays.
Read the complete transfer modelNamed internal roles and routines take over. The Adoption Coach stays. The mandate per domain is bounded at two to three waves, with the end date written into Gate 0.
The handover, step by step
Select a step
Step 1 · At Gate 0
Gate 0 names the internal successor and writes the mandate’s end date into the charter. The successor shadows the office lead. From Gate 1, an internal Adoption Coach works next to the external one, and the internal share rises.
Who decides: your named roles, at every gate. The weekly rhythm: the office carries it while your successor shadows. Making, challenging, substituting and exiting are still supported by the office.
The exit is designed before the work starts. Successors know the date by which they must be ready, and the sponsor gets a scheduled decision.
Step 2 · From Gate 3
From Gate 3, internal owners chair the meetings, sign and present. Decisions are prepared jointly with the office, and external support reduces as the wave goes on.
Who decides: your named roles, at every gate. The weekly rhythm: your owners chair it and the office supports. Making, challenging, substituting and exiting are prepared jointly.
Your people take real decisions with support at hand, before they have to take them alone.
Step 3 · Before Gate 5
Your teams now run the routines and chair the decisions while the office stands aside. These are the main transfer conditions, each evidenced rather than asserted:
A third party can check the exit test from the paperwork alone. The transfer scorecard is a self-assessment by the office being tested. When a wave is high-risk, or further work is under discussion, verification should pass to a party with no stake, such as internal audit.
Who decides: your named roles, at every gate. The weekly rhythm: your people run it and the office observes in silence. Making, challenging, substituting and exiting are now exercised independently.
A wave that cannot show this evidence waits, whatever the calendar says.
Step 4 · Gate 5 and day 90
At Gate 5 the external team’s part ends: the dossier is signed, the assets are owned internally and the office leaves. Authority stayed with your named roles throughout, and the Adoption Coach stays. Ninety days later, a light review checks the five things the first months erode:
Who decides: your named roles. The weekly rhythm: your people own it and the coach stays. The office has left.
The capability lives inside your organization. The next wave starts on the assets this one left behind.
The Adoption Office, the four dependency questions, coaching and the exit test · Whitepaper, pp. 21–22, 27–29
Everything is measurable: what a use case is worth to the organization, what you steer on, and whether the organization learns and grows in capability, wave after wave.
Every measure has an owner, an evidence location and a date. Time saved needs a realization decision: how does it become capacity, service, revenue, risk reduction or another business outcome?
Check quality, cost, incidents, oversight, active task use, workarounds, trust and workload in production.
Compare cycle time, quality, throughput or service with the baseline. Record the business owner’s value decision.
Track assets consumed and produced, internal decision-making, support ownership and the ability to change suppliers.
Seven measurement layers · Whitepaper, pp. 17–19
We wrote the whitepaper to map this whole system of AI adoption capability into one model, one paper and five practical tools that walk you through the steps.
The whitepaper includes five practical canvases. They share identifiers so a use case can be followed from visible work through its foundation, obligations and architecture.

Map the use case, people, workflow, human oversight and evidence of adoption.

Connect governance, data, architecture, operations and the assets the next wave inherits.

Bring visible delivery and the capability foundation into one management view.

Record intended purpose, applicability, obligations, accountable owners and evidence.

Map the layers, interfaces, decisions and ownership behind the working capability.
The five tools are included on pp. 34–38 of the full whitepaper.
Forty-three pages of research and working tools: the model, six gates, decision rights, measurement, the transfer test and five canvases. Identify yourself with your work email and the access link arrives in your inbox.
The link in the email is personal and valid for 7 days. Not there after a few minutes? Check your spam folder, or .

Enterprise sponsors, domain leaders, product and delivery teams, architects, control owners and workforce leaders who need AI to become a dependable way of working. The whitepaper is oriented toward the European enterprise context.
It is an operating model: a way to connect business ownership, production delivery, responsible operation and internal capability. Its tools can be used alongside your existing platforms and governance.
No. Each wave should inherit approved assets and leave useful additions behind. Readiness is assessed before Gate 0. If it is too weak, the first step is a readiness project or a smaller use case.
No. A chosen, priced and replaceable specialist can remain. What should decline is dependence on a particular external party to make decisions, challenge them, substitute a supplier or exit an arrangement.
A named budget line does, agreed before the handover rather than at it. The cost side is built at the same gates as the benefit side: a candidate envelope at Gate 0, a first run-cost estimate at Gate 2, metered consumption during bounded production, and both halves measured at Gate 4. At Gate 5 the domain owner accepts the run cost into a budget line.
Version 1.1 is published as a design proposal. It combines established ideas; the complete configuration has not yet been evaluated in practice. The reference case is illustrative and the timings are planning assumptions.
Agree what will go live.
And who will run it after.